Showing posts sorted by relevance for query PGM mines. Sort by date Show all posts
Showing posts sorted by relevance for query PGM mines. Sort by date Show all posts

Valterra PGM Production Rises as South African Mines Recover From Flood Disruption

No comments
Valterra PGM Production Rises as South African Mines Recover From Flood Disruption
Valterra PGM

Valterra PGM production increased in the first quarter as South African mine output normalised after flooding disrupted operations a year earlier. The company produced 743,500oz of mined platinum group metals in January-March, up 7% from the same period in 2025.

Valterra PGM production was supported by higher output from the Amandelbult and Mototolo mines. Amandelbult recovered from the severe flooding that affected production in the first quarter of last year.

Valterra PGM production growth was partly offset by weaker output at Mogalakwena and Unki. Even so, refined production and sales volumes rose sharply, giving the company a stronger first-quarter operating result.

The company, previously known as Anglo American Platinum, maintained its full-year guidance at 3mn-3.4mn oz for both metal-in-concentrate and refined PGM production.

Amandelbult Recovery Lifts Mined Output

Amandelbult and Mototolo drove the increase in mined PGM output. The year-on-year comparison was helped by the normalisation of Amandelbult after flooding disrupted the mine in early 2025.

Mogalakwena remained a drag on the quarter. PGM production at the mine fell by 6% to 212,300oz because of lower milled volumes.

Unki output also declined. Production fell by 4% to 51,700oz because of the planned mining of lower-grade ore.

The mixed mine performance shows that South African PGM supply remains operationally sensitive. Weather disruption, grade variation and milling rates can all move quarterly output even when full-year guidance remains intact.

For the global PGM market, Valterra’s recovery matters because South Africa remains the largest source of primary platinum group metals. Any improvement in South African output can affect availability for automotive catalysts, hydrogen technologies, chemicals, electronics and jewellery.

Refined Output and Basket Prices Strengthen Revenue Conditions

Refined PGM production increased by 78% on the year to 778,500oz. The rise reflected higher metal-in-concentrate production and the rescheduling of annual stock counts from the first quarter to the third quarter to reduce costs.

Sales volumes rose by 60% to 791,400oz. Higher refined output and a marginal drawdown of refined inventory supported the increase.

Valterra also benefited from stronger pricing. Its average realised basket price rose by 90% on the year to $2,911/oz.

That price increase is important because PGM producers have faced years of margin pressure from volatile demand, cost inflation and weak prices in some metals. A stronger basket price can improve cash generation and support operational stability.

By-product output also increased. Nickel production rose by 41% to 5,880t, while copper output climbed by 26% to 3,845t.

These by-products matter because nickel and copper can improve mine economics. They also link PGM operations to broader battery, alloy and electrification supply chains.

Valterra’s first-quarter result therefore shows improvement across mined output, refined production, sales and by-product recovery. The key question is whether stronger operating performance can be sustained through the rest of the year.

The Metalnomist Commentary

Valterra’s first-quarter recovery shows how quickly PGM production can rebound when operational disruptions normalise. But South African PGM supply remains exposed to mine-specific risks, making stable output just as important as higher prices.

Implats PGM Output Holds Steady as Zimbabwe Strength Offsets South African Pressure

No comments
Implats PGM Output Holds Steady as Zimbabwe Strength Offsets South African Pressure
Implats

Implats PGM output remained broadly stable in the first half of its 2026 financial year, showing how diversified production can protect group performance even when key South African mines weaken. Total group 6E production rose by just 0.8pc to 1.798mn oz, while managed operations increased by 1pc year on year. As a result, Implats PGM output held close to last year’s level despite clear pressure at several individual assets.

This stability matters because the platinum group metals market is entering a more sensitive phase. Global PGM prices have strengthened over the past six months, supported by tight mine supply, resilient demand, and stronger precious metals sentiment under geopolitical uncertainty. Therefore, even near-flat production from a major producer like Implats carries significance for the wider market.

The performance also highlights a familiar regional divide. South African operations at Rustenburg and Marula both posted declines, while Zimbabwean output at Zimplats expanded strongly. Meanwhile, Impala Canada saw lower output because of planned tapering. Consequently, Implats PGM output now reflects a portfolio where growth outside core South African assets is becoming more important.

Zimbabwe PGM Growth Is Supporting Group Stability

Zimbabwe PGM growth provided the strongest positive contribution in the period. Zimplats lifted 6E production by 13pc year on year to 317,000oz, making it the clearest bright spot in the group’s first-half results. That increase helped offset weaker output from South African mines and lower volumes in Canada. As a result, Zimbabwe continues to strengthen its role inside the Implats production base.

This shift matters because South African PGM production is no longer carrying the group as comfortably as before. Rustenburg production fell by 2pc to 888,000oz, while Marula declined by 4pc to 97,000oz. These are not catastrophic drops, but they reinforce the operational pressures still facing mature South African mining assets. Therefore, Zimbabwe PGM growth is not just helpful. It is increasingly strategic.

The contrast also reflects a broader industry theme. Investors and market participants are paying closer attention to which PGM producers can hold volumes steady without relying too heavily on aging or more difficult assets. In that context, Implats PGM output looks more resilient because its growth is not coming from one region alone. Meanwhile, a more balanced geographic mix can improve flexibility if operating conditions worsen elsewhere.

Global PGM Prices Are Improving the Revenue Picture

Global PGM prices are now giving producers a more supportive revenue environment. Implats reported sales revenue of R33,250 per 6E oz sold, up 39pc year on year. The improvement came mainly from a stronger US dollar PGM basket price, although some of that benefit was offset by the appreciation of the South African rand. Consequently, earnings leverage is improving even when production growth remains limited.

That revenue uplift is important because PGM producers have spent several years operating under uneven price conditions and cost pressure. When output growth is limited, stronger basket prices become even more valuable. Therefore, the latest pricing backdrop may matter more for profitability than the near-flat production number alone.

The next question is whether price support can last. Tight mine supply and steady demand are constructive, but PGM markets are still highly sensitive to macro conditions, auto-sector demand, and investor sentiment toward precious metals. As a result, Implats enters the second half with a more favorable price environment, but not without risk. Even so, the combination of steady Implats PGM output and higher realized prices puts the group in a firmer position than the headline production number might suggest.

The Metalnomist Commentary

Implats did not deliver dramatic production growth, but that may not be the most important part of this result. What matters more is that the company held volumes steady while price conditions improved and Zimbabwe delivered real support. In the current PGM market, stable output with stronger basket pricing can be more valuable than chasing marginal volume growth.

Sibanye-Stillwater PGM Production Falls as Stronger Precious Metals Prices Lift Revenue

No comments
Sibanye-Stillwater PGM Production Falls as Stronger Precious Metals Prices Lift Revenue
Sibanye-Stillwater

Sibanye-Stillwater PGM production declined in 2025, but stronger precious metals prices lifted revenue and earnings across the group. The result shows how price recovery can offset operational pressure in the platinum group metals market, especially when supply remains constrained and downstream demand stays uneven.

The South African mining group reported a 14pc increase in revenue to R129.7bn, equal to about $7.3bn. The improvement came despite lower production from both its South African and US PGM operations. Higher basket prices, especially in the second half of the year, provided the main earnings support.

Sibanye-Stillwater PGM production from its South African operations reached 1.7mn oz of 4E PGM in 2025. This was down by 0.8pc from the previous year. However, the company achieved an average South African 4E basket price of $1,740/oz, up sharply from $1,322/oz in 2024.

Higher PGM Basket Prices Offset Lower Mine Output

Stronger PGM prices helped Sibanye-Stillwater protect profitability despite weaker production volumes. Adjusted earnings before interest, taxes, depreciation, and amortisation at the South African PGM operations rose by 125pc to R16.7bn. This reflects the operating leverage that miners can achieve when prices recover faster than costs increase.

The production decline also highlights the broader challenge facing mature PGM operations. South African mines continue to operate in a difficult environment shaped by cost inflation, ageing assets, electricity risk, and labour intensity. In that context, higher prices are important, but they do not remove the need for disciplined restructuring and productivity gains.

Meanwhile, Sibanye-Stillwater’s US 2E PGM production fell by 33pc year on year. The decline was significant, but stronger palladium prices improved the sales picture. The company achieved an average US 2E basket price of $1,195/oz in 2025, compared with $988/oz a year earlier.

Palladium Trade Action and Battery Metals Add Strategic Context

Palladium remains a strategic factor for Sibanye-Stillwater because the company has direct exposure through its US operations. The company highlighted preliminary US anti-dumping duties on Russian palladium, following petitions filed by Sibanye-Stillwater and the United Steelworkers Union. The move could support domestic and allied palladium producers if it reshapes import economics.

The company’s US operations also returned to profitability after restructuring. This matters because North American palladium supply carries strategic value in a market exposed to Russian material, automotive demand uncertainty, and changing emissions technology. Any policy support that reduces unfair price pressure could improve the outlook for non-Russian producers.

At the same time, Sibanye-Stillwater continues to broaden its portfolio beyond PGMs. Its Australian Century zinc operation produced 101,000t of zinc, up by 22pc on the year. Its Keliber lithium project also advanced toward production as construction neared completion and the first mining blast took place this month.

The Metalnomist Commentary

Sibanye-Stillwater’s 2025 results show that PGMs remain a price-sensitive business where earnings can recover before volumes do. The bigger question is whether stronger palladium and PGM prices can support long-term reinvestment in assets that still face structural cost and demand uncertainty.

India PGM Extraction Advances With OMC Pilot Trial in Odisha

No comments
India PGM Extraction Advances With OMC Pilot Trial in Odisha
Odisha Mining

India PGM extraction has taken an important step forward after Odisha Mining Corporation completed a pilot-scale trial to recover platinum group metals from chromite ore. The successful trial marks progress toward domestic production of platinum, palladium and rhodium.

India PGM extraction is strategically important because the country currently relies almost entirely on imported platinum group metals. Most of those imports come from South Africa and Russia, leaving Indian manufacturers exposed to supply disruptions, geopolitical risk and price volatility.

India PGM extraction could also strengthen the country’s broader critical metals strategy. PGMs are essential for automotive catalytic converters, clean-energy technologies, electronics, defence systems and advanced manufacturing.

The trial was completed at the Institute of Minerals and Materials Technology in Bhubaneswar using chromite ore from OMC’s Bangur mine in Odisha. The 1 t/h pilot plant will now be used to validate recovery rates, operating stability and scalability under real-time conditions.

Chromite Ore Route Could Open Domestic PGM Supply

OMC’s pilot programme focuses on extracting PGMs from chromite ore associated with the Bangur mine. This is significant because chromite deposits can contain recoverable platinum group elements if mineralogy, processing and recovery economics are favourable.

The pilot plant will test whether the process can move beyond laboratory success. Recovery rates, concentrate quality, operational consistency and scalability will determine whether India can move toward commercial production.

The project was developed under a 100mn rupees research and development programme. OMC is working with CSIR-IMMT and Mintek South Africa, combining domestic resource access with international processing expertise.

This collaboration matters because PGM extraction and beneficiation are technically demanding. Platinum, palladium and rhodium often occur in low concentrations and require specialised processing, concentration and smelting routes.

The broader goal is to establish India’s first integrated PGM beneficiation and smelting facility. If successful, the project could turn Odisha’s chromite resources into a domestic source of strategic metals.

Critical Metals Security Becomes Industrial Priority

India’s dependence on imported PGMs creates risk for several industries. Automotive catalytic converters remain a major end-use, especially as emissions standards require reliable access to platinum, palladium and rhodium.

Defence, electronics and advanced manufacturing also need secure PGM supply. These applications often require small volumes but high reliability, making supply security more important than simple commodity availability.

Domestic PGM production would not immediately remove India’s import dependence. However, it could create a strategic buffer, support local processing skills and reduce exposure to external supply shocks.

OMC’s next challenge is commercialisation. The pilot plant must prove that recovery can be stable, scalable and economically viable using Bangur chromite feedstock.

For India’s critical minerals policy, the project shows the value of recovering strategic metals from existing mining operations. By-product recovery can improve resource efficiency and create new domestic supply streams without relying only on new primary mines.

The Metalnomist Commentary

OMC’s pilot trial shows that India is moving from critical minerals policy ambition into process development. The real breakthrough will come if Odisha’s chromite resources can support a commercial PGM beneficiation and smelting route.

Sibanye-Stillwater Sees Mixed PGM Output in 2024: US Down, Africa Up

No comments
Sibanye-Stillwater

US Operations Cut Output as Africa and Zimbabwe Deliver Gains

Restructuring and Metal Prices Shape Production Strategy
Sibanye-Stillwater, the South African platinum group metals (PGM) major, reported a slight decline in US PGM output in 2024 but growth in South Africa and Zimbabwe. The company’s US Stillwater and East Boulder mines produced 425,842oz of 2E PGMs for the year, down less than 1% year-on-year. In the last six months of 2024, US production dropped by 15.4% as Sibanye focused on lowering costs amid challenging metal prices.

Cost Management and US Restructuring Drive Changes

The average 2E PGM basket price in the US fell below the all-in sustaining cost, prompting Sibanye to restructure. The company put the Stillwater West mine on care and maintenance, while East Boulder and Stillwater East mines saw reduced output. Despite lower mine volumes, PGM recycling at the Columbus metallurgical complex rose by 2% to 316,470oz for 2024, including a 9.2% increase in the second half.

African and Australian Operations Report Output Increases

In South Africa and Zimbabwe, Sibanye’s 4E PGM production rose by 4.2% in H2 2024 and 4% for the full year, reaching 1.74 million ounces. Key operations are located in the Bushveld Complex, Kroondal, Rustenburg, Marikana, and Mimosa. Beyond PGMs, nickel output at the Sandouville refinery in France climbed 8.1% to 7,705 tonnes, and zinc production at Australia’s Century site increased by 8% to 82,000 tonnes.

Sibanye’s regional flexibility, ongoing cost discipline, and diversified asset base position the company to navigate volatile PGM prices and evolving market conditions.

Closed-Loop Recycling to Slash PGM Demand by 40% in 2024, Industry Report Finds

No comments
Johnson Matthey

PGM Recycling Revolutionizes Metal Demand with Close to 60% of Platinum Group Metals Being Recycled

In 2024, platinum group metals (PGMs) demand will see a significant reduction of nearly 40% due to the rise in closed-loop recycling, according to a report from UK-based chemicals company Johnson Matthey. With over 60% of PGMs used in new products now coming from recycled metal, the shift towards circularity in the PGM industry is transforming how metals are sourced and used.

Understanding Closed-Loop vs. Open-Loop Recycling

Recycling PGMs is categorized into two pathways: open-loop and closed-loop. Open-loop recycling occurs mainly in consumer markets, where metal ownership is passed along with the product's lifecycle, allowing the metal to be reused for different purposes. In contrast, closed-loop recycling, which dominates industries like chemicals and pharmaceuticals, involves the original buyer maintaining ownership of the metal, reusing it for the same purpose throughout its lifecycle.

This process greatly reduces the need for new PGMs, as the original purchaser reclaims and reuses the metal. In fact, Johnson Matthey's research shows that a substantial 15.7 million troy ounces (toz) of PGMs were recirculated globally in closed-loop systems last year, cutting down the net demand for primary PGMs to 35.4 million toz in 2024.

PGM Recycling Shifts the Industry Landscape

Recycled PGMs, whether through closed or open loops, now make up the majority of materials used in new and replacement products. As primary mining becomes supplementary to the increasing urban PGM mines, it’s clear that recycling is becoming the backbone of the global PGM supply chain. The well-established closed-loop system has proved to be an efficient, sustainable model for metal recycling, potentially setting a precedent for other metals in the industry.

Ryan from Johnson Matthey highlighted that the long-established network of PGM recycling has reached economies of scope and scale through decades of market-driven optimization. This model could serve as a roadmap for other sectors, where the international approach to recycling has not yet reached similar maturity.

Recycling efforts should not be confined within national borders. To ensure efficiency, scrap must be collected and recycled globally, transcending domestic limitations. Ryan advocates for a broader, global collaboration to boost recycling effectiveness and reduce dependence on newly mined metals.

Amplats Boosts 2Q PGM Sales Despite Weaker Output

No comments

South African metals mining company Amplats has reported a 14% increase in platinum group metals (PGM) sales for the second quarter compared to the previous year, even though production fell by 2% due to low grades and challenging ground conditions at several of its mines.

Amplats credited operational initiatives at the Amandelbult complex in South Africa for the positive results. The firm's refined PGM production rose by 7% year-on-year to 1.15 million troy ounces (toz).

While the company's own-managed mine metal in concentrate production fell by 3% year-on-year to 547,200 toz in April-June, it marked a 9% increase from the first quarter.

PGM production at Amandelbult increased by 7% to 157,600 toz, thanks to improved ore grades and better underground infrastructure. This increase partially offset the lower production figures at other units. Production at Mototolo, Mogalakwena, and Unki in South Africa dropped by 14% to 66,300 toz, 4% to 232,600 toz, and 7% to 54,700 toz, respectively.

Tragically, during the second quarter, two workers died at Amplats' Dishaba Mine, part of the Amandelbult complex. The fatalities led to a work stoppage across the mine, which is expected to reduce Amandelbult's 2024 metal in concentrate production by 5%.

PGM sales from production increased by 14% year-on-year to 1.27 million toz. Amplats attributed the rise in sales to higher refined production and the drawdown of finished goods. However, the increase in sales volumes was counterbalanced by significantly lower sales prices for PGMs, with the average second-quarter PGM basket price at $1,419/toz, down 18% from a year earlier.

The decline in the PGM basket price was driven by a 31% drop in palladium prices and a 37% decrease in rhodium prices. Platinum prices also fell by 2% over the same period.

Amplats stated that its production guidance for 2024 remains unchanged, though this could be affected by potential power supply curtailments by South African utility Eskom. The company's production numbers were adjusted to reflect the sale of Amplats' 50% interest in the Kroondal project on November 1.

Valterra Platinum PGM production dips on Amandelbult repairs

No comments
Valterra Platinum PGM production dips on Amandelbult repairs
Valterra Platinum

Valterra Platinum PGM production fell in the second quarter after flooding forced repairs at Amandelbult. The company produced 464koz of metal in concentrate, down 2% year on year. Operations at Amandelbult were suspended after heavy rains in the first quarter. As a result, first-half production declined by 5%.

Amandelbult drag, other mines steady

Amandelbult’s output dropped 55% to 70.2koz, with most of the quarter spent on repairs. Excluding Amandelbult, own-mine production edged up 1%. Mogalakwena, Mototolo and Modikwa delivered higher volumes, partly offsetting Amandelbult’s shortfall. Therefore, Valterra Platinum PGM production outside Amandelbult showed resilience.

Pricing improves as sales shrink

Sales volumes, excluding trading, fell 22% to 981.5koz, reflecting lower refined production. However, realized prices strengthened. The average basket price rose 6% to $1,509/oz, led by rhodium up 16%. Platinum and palladium realizations also increased by 2%. By contrast, base-metal by-products weakened. Nickel production declined 13% to 6,408t, while copper fell 23% to 3,573t. Meanwhile, Valterra Platinum PGM production faces near-term constraints as Amandelbult restarts.

Valterra completed its demerger from Anglo American during the quarter and now operates independently. The separation followed Anglo’s decision to spin off PGM assets after BHP’s 2024 approach. Consequently, management attention remains on operational stability and refined output recovery.

The Metalnomist Commentary

The production setback is location-specific rather than systemic. If Amandelbult ramps smoothly, mix and pricing can cushion revenues. Watch rhodium strength and South African power reliability for the next leg in margins.

Anglo American Reports 3Q Decline in Copper Output but Revises Nickel and PGM Guidance Upwards

No comments
Anglo American

Anglo American, the UK-South African mining giant, experienced a 13% year-on-year decline in copper production during the third quarter of 2024, with output falling to 181,000 tons. The decrease was primarily attributed to reduced production at its mines in Chile and Peru.

Copper Production Highlights

  • Peru’s Quellaveco Mine: Output fell 21% to 68,700 tons due to lower grades and recoveries. Production is expected to rebound in the fourth quarter.
  • Chilean Operations: Output dropped 7% to 112,600 tons, driven by the planned closure of the Los Bronces plant in July, where production fell 20%. However, higher grades at El Soldado boosted output by 16%, partially offsetting the losses.
Total copper production for the year to date reached 575,000 tons, down 4% year-on-year. The company remains on track to meet its full-year production guidance of 730,000-790,000 tons, split between 430,000-460,000 tons from Chile and 300,000-330,000 tons from Peru.

Platinum Group Metals (PGMs) Performance

  • PGMs in Concentrate: Production dropped 10% to 922,000 ounces due to lower output at South Africa’s Mogalakwena and Amandelbult mines. Higher production at Zimbabwe’s Unki mine partially offset these declines.
  • Refined PGMs: Production rose 22% to 1.11 million ounces, supported by stability in processing operations.
Anglo American revised its full-year refined PGM production guidance upward to 3.7-3.9 million ounces, from the earlier estimate of 3.3-3.7 million ounces.

Nickel Production Trends

Nickel output increased 6% to 9,900 tons during the quarter, driven by operational improvements at the Barro Alto plant in Brazil. Year-to-date nickel production reached 28,900 tons, up 2%.

The company raised its full-year nickel production guidance to 38,000-39,000 tons, up from its earlier range of 36,000-38,000 tons.

Outlook

Anglo American’s diversified portfolio continues to offset challenges in copper production with strong performance in nickel and PGMs. While facing difficulties in its copper operations, the upward revisions in nickel and PGM guidance underscore the company’s adaptability and operational resilience.

Anglo American Faces Decline in Copper, Nickel, and PGM Output in 2024

No comments
Anglo American

Decreased Production from Chile, Peru, and South Africa Affects Key Metals

Anglo American, the UK-South African mining giant, reported a drop in its copper, nickel, and platinum group metals (PGMs) output for 2024. This decline, particularly from its assets in Chile, Peru, and South Africa, reflects challenges faced in production and ongoing operational adjustments.

Copper Production Decline Driven by Chile and Peru

Anglo American’s total copper output for 2024 decreased by 6%, reaching 772,700 tonnes. Copper production in Chile dropped by 8% to 466,400 tonnes, with a 20% decline at the Los Bronces mine, which was placed on care and maintenance in July. Additionally, production at the Collahuasi mine fell by 3%, though higher grades at El Soldado partially offset these declines, with a 22% output increase.

In Peru, the Quellaveco mine saw a 4% reduction in copper output to 306,300 tonnes, due to lower grades and recoveries. Anglo American’s Q4 copper output also saw a notable drop, decreasing by 14% to 197,500 tonnes compared to the previous year.

Looking ahead, the company projects copper production to range between 690,000 and 750,000 tonnes in 2025, with an expectation of increasing production to 760,000 to 820,000 tonnes in 2026 and 2027.

Nickel and PGM Production Challenges

Nickel output for Anglo American fell by 2% in 2024, totaling 39,400 tonnes. A 13% drop in production at the Codemin site in Brazil was partially offset by a 2% increase at the Barro Alto plant due to operational improvements. In Q4, nickel production declined by 10%, amounting to 10,000 tonnes, primarily due to planned lower grades.

The company also faced a 7% decline in PGM production from its operations, including mines in South Africa and Zimbabwe. Full-year production of PGMs in concentrate decreased to 3.55 million ounces. However, refined PGM production rose by 3%, reaching 3.92 million ounces in 2024. In 2025, Anglo American expects to produce between 3 million and 3.4 million ounces of PGMs.

Manganese Ore Decline and Future Expectations

Anglo American’s manganese ore production fell sharply by 38% to 2.29 million tonnes in 2024. This was largely due to the suspension of Australian operations following damage caused by Tropical Cyclone Megan in March.

Despite the setbacks in 2024, the company’s projections for future production of copper, nickel, and PGMs indicate a positive outlook for 2025 and beyond, as it continues to adjust operations and focus on optimizing output at key sites.

Ivanhoe QIA $500mn funding strengthens African critical minerals pipeline

No comments
Ivanhoe QIA $500mn funding strengthens African critical minerals pipeline
Ivanhoe Mines

The Ivanhoe QIA $500mn funding will inject fresh capital into one of Africa’s most important critical minerals portfolios. Ivanhoe Mines plans to raise $500mn from the Qatar Investment Authority through a 57.5mn share issue. As a result, the Ivanhoe QIA $500mn funding will support exploration, development and mining across copper, zinc, PGMs and other critical minerals in southern Africa.

Ivanhoe QIA $500mn funding underpins growth after Kamoa-Kakula setback

The Ivanhoe QIA $500mn funding gives the Canadian miner balance sheet strength at a sensitive moment. Ivanhoe will issue new shares at C$12 each, equal to about 4pc of its total equity. Therefore, the QIA secures a meaningful strategic foothold in a multi-asset African growth story.

Capital will help offset the impact of weaker guidance at the flagship Kamoa-Kakula copper complex in the DRC. The project now expects 370,000–420,000t of copper in concentrate this year. This range is almost 30pc below the initial 520,000–580,000t outlook, after Ivanhoe suspended mining in some areas because of seismic activity. However, Kamoa-Kakula remains one of the world’s lowest-cost, largest-scale copper growth engines.

Funding supports broader African critical minerals portfolio

The Ivanhoe QIA $500mn funding will not only stabilise Kamoa-Kakula but also advance other key assets. Ivanhoe intends to channel part of the proceeds into exploration and development of “critical minerals” across its portfolio. This portfolio includes copper, zinc, lead, germanium and platinum group metals.

In the DRC, the Kipushi mine has restarted as a zinc-copper-lead-germanium operation. The asset offers high-grade feed into markets sensitive to supply disruptions and ESG performance. Meanwhile, in South Africa, the Platreef project is moving toward first production in the fourth quarter. Platreef will add large-scale PGM, nickel and copper output, reinforcing Ivanhoe’s exposure to energy transition and automotive catalysts.

By backing this broader platform, the QIA diversifies beyond a single copper asset. Therefore, the Ivanhoe QIA $500mn funding represents a long-term bet on Africa as a core supplier of critical minerals. It also highlights the growing role of Gulf sovereign wealth in shaping mining capital flows.

The Metalnomist Commentary

QIA’s entry confirms Ivanhoe’s position as one of the most strategically important miners in the African copper and critical minerals space. The funding cushions near-term production setbacks while keeping long-dated projects like Platreef and Kipushi on track. Market participants should watch how quickly Ivanhoe converts this capital into stable output growth, especially as copper markets tighten and geopolitical competition for African resources intensifies.

Kamoa-Kakula copper production rises in 2Q as Ivanhoe locks in offtake

No comments
Kamoa-Kakula copper production rises in 2Q as Ivanhoe locks in offtake
Ivanhoe Mines

Kamoa-Kakula copper production increased 11% year on year in the second quarter. Kamoa-Kakula copper production reached 112,009 tonnes of copper in concentrate. Operations resumed in early June after a 20 May seismic event. Ivanhoe cut 2025 guidance to 370,000–420,000 tonnes. Kamoa-Kakula copper production for the first half totaled 245,127 tonnes.

June output validated stable operations across three concentrators. The site produced 28,147 tonnes in June alone. The on-site 500,000-tonne-per-year smelter will start in early September. First 99.7% copper anode is scheduled for October.

Smelter start-up and offtake de-risk cash flows

Trafigura signed a three-year offtake for 20% of anode output. The deal includes a $200 million prepayment facility. Citic Metal and Gold Mountains secured the remaining 80% earlier this year. As a result, anode sales have full coverage during ramp-up.

In-country smelting should reduce transport and TC/RC exposure. The smelter also improves working capital turns. Therefore, Ivanhoe gains greater margin control across the value chain.

Recovery upgrades and new ore underpin 2026 growth

Project 95 targets a recovery lift from 87% to 95% by early 2026. The project is about 50% complete and on schedule. A new eastern mining area will add high-grade ore by the second quarter of 2026. These upgrades support volumes and lower unit costs.

Portfolio updates complement the copper outlook. Kipushi produced 41,788 tonnes of zinc in the quarter. Platreef remains on track for first PGM production in the fourth quarter.

The Metalnomist Commentary

Ivanhoe is pairing operational resilience with commercial de-risking. The smelter and offtakes tighten cash generation while recovery gains add structural margin. Watch guidance delivery, smelter ramp curves, and ore-quality cadence into 2026.

Jubilee Metals Zambia Copper Push Gets Early Funding for Molefe Asset

No comments
Jubilee Metals Zambia Copper Push Gets Early Funding for Molefe Asset
Jubilee Metals

Jubilee Metals Zambia copper strategy has gained modest early-stage funding after the London-listed company secured a $1.5mn convertible loan for its Molefe copper asset. The loan will support drilling and licence work as Jubilee builds its Zambian copper platform.

Jubilee Metals Zambia copper growth now centres on feeding near-surface material from Molefe into the existing Sable refinery. This lowers upfront capital needs compared with a standalone copper development project.

Jubilee Metals Zambia copper ambitions remain dependent on additional external funding. The current loan provides short-term support, while the backer is also considering a larger staged investment of $10mn.

The financing comes as Jubilee shifts away from its South African chrome and platinum group metals assets. The company is redirecting capital toward copper, where it sees stronger growth potential.

Molefe Offers Lower-Cost Route Into Copper Processing

Molefe is strategically important because it can supply material to Jubilee’s existing Sable refinery. That gives the project a practical processing route without requiring a full new refining complex.

The near-surface nature of the operation also helps reduce early development costs. Jubilee can focus initial spending on drilling, licensing and stockpile development rather than heavy greenfield infrastructure.

This model fits smaller copper developers trying to scale under tight capital conditions. Instead of building large mines first, companies can use existing processing assets and incremental feedstock growth.

Jubilee plans to build stockpiles at Molefe to support future refining. That will be important for ensuring stable feed to Sable and improving operating continuity.

However, the $1.5mn loan is limited in scale. It supports early work, but larger funding will be needed if Jubilee wants to expand mining and processing capacity meaningfully.

Zambia Becomes Core to Jubilee’s Growth Strategy

Jubilee has increasingly focused on Zambia as it pivots toward copper. The country remains one of Africa’s most important copper jurisdictions and continues to attract investment tied to electrification and energy transition demand.

The company’s copper output has improved as the Roan concentrator stabilised and Molefe expanded its role as feedstock for Sable. This gives Jubilee a clearer operating base than during earlier ramp-up challenges.

The planned sale of South African chrome and PGM assets would sharpen that focus further. It would free capital and management attention for copper growth in Zambia.

The strategy reflects wider market logic. Copper demand remains supported by power grids, renewable energy, data centres, electric vehicles and industrial electrification.

For Jubilee, the challenge is execution. It must convert a low-cost processing model into steady copper output, secure enough feedstock and attract the capital required for expansion.

The potential $10mn staged investment could become more important than the initial loan. It would provide a stronger bridge between early development and larger operating scale.

The Metalnomist Commentary

Jubilee’s Molefe funding is small, but the strategy is practical. In a capital-constrained copper market, assets that can feed existing refineries may advance faster than larger standalone projects.

NexMetals Botswana nickel project advances with EXIM financing plan

No comments
NexMetals Botswana nickel project advances with EXIM financing plan
NexMetals

NexMetals Botswana nickel project moved closer to funding after a US EXIM letter of interest. The NexMetals Botswana nickel project could receive up to $150mn to redevelop Selebi and Selkirk. The NexMetals Botswana nickel project targets nickel, copper, cobalt, and platinum group metals.

US EXIM financing under CTEP

EXIM signaled support on 17 July with a non-binding letter of interest. The potential loan carries a maximum 15-year tenor. The package falls under EXIM’s China and Transformational Exports Program. As a result, EXIM prioritizes projects that strengthen US competitiveness in critical minerals. Eligible US procurement could unlock cost-effective access to advanced mining technology.

However, EXIM requires a full application and diligence before commitment. NexMetals must demonstrate technical feasibility and bankable project economics. The company will also outline procurement pathways for US goods and services.

Resource base and project milestones

Selebi hosts an indicated 3mn t at 0.98% nickel and 0.9% copper. That equals 29,500t nickel and 27,100t copper contained. Inferred resources add 227,000t nickel and 371,000t copper. Selkirk’s inferred resources include 108,000t nickel and 132,000t copper. The deposit also contains 775,000oz palladium and 174,000oz platinum.

Therefore, the mines could anchor a regional battery metals hub. The project aligns with US and allied EV supply chains. It also supports Botswana’s push into value-added processing.

Meanwhile, the financing roadmap remains critical to timing. A final decision depends on diligence outcomes and market conditions. Offtake structuring and equipment sourcing will shape the construction path.

The Metalnomist Commentary

EXIM’s early signal gives the project strategic momentum, not certainty. If NexMetals converts the LOI, Botswana gains a credible nickel sulphide supplier with PGM credits. The next hurdle is disciplined feasibility and a financing stack resilient to nickel price volatility.