Showing posts sorted by relevance for query BESS. Sort by date Show all posts
Showing posts sorted by relevance for query BESS. Sort by date Show all posts

OCI, CPS, LGES Partner on Texas BESS Project

No comments
OCI, CPS, LGES Partner on Texas BESS Project
Battery Energy Storage System (BESS)

The Alamo City BESS project in Texas marks a major milestone in energy storage and US-Korea clean energy collaboration.

Texas Battery Storage Capacity to Expand with 120MW BESS

OCI Energy, CPS Energy, and LG Energy Solution Vertech will jointly develop the Alamo City Battery Energy Storage System (BESS). The 120MW/480MWh facility, located in Bexar County, Texas, will supply backup power during peak demand periods.

Under the deal, LGES Vertech will deliver the BESS units and energy management systems to OCI Energy, the project developer. CPS Energy, the municipal utility serving San Antonio, will purchase the storage capacity through a long-term offtake agreement.

This collaboration increases CPS Energy's battery storage portfolio to 520MW, ensuring greater grid reliability across south-central Texas.

BESS Project Aligns with Vision 2027 Energy Plan

The Alamo City BESS project is scheduled to begin operation by late 2026. It will play a crucial role in Vision 2027, CPS Energy’s roadmap to a balanced, reliable, and sustainable energy mix.

Vision 2027 includes plans for 1,710MW of natural gas, 500MW of firming capacity, 84MW of wind, and 730MW of solar. The addition of this battery storage system helps CPS diversify and decarbonize its energy infrastructure.

As a result, this project strengthens both energy resilience and cross-border cooperation between the US and South Korea in the energy transition.

The Metalnomist Commentary

The Alamo City BESS is more than a storage project—it’s a blueprint for municipal utilities navigating the clean energy transition. With players like OCI, CPS, and LGES joining forces, we’re seeing the integration of international technology with local grid needs. Expect similar regional collaborations to follow as US battery storage demand accelerates through 2030.

Samsung SDI BESS Supply Deal Strengthens US Energy Storage Battery Chain

No comments
Samsung SDI BESS Supply Deal Strengthens US Energy Storage Battery Chain
Samsung SDI BESS

Samsung SDI BESS supply deal activity is accelerating in the US as demand for grid-scale battery storage continues to rise. The South Korean battery manufacturer has secured a 1.5 trillion won, or about $1 billion, contract to supply BESS batteries to a US energy company over four years.

The Samsung SDI BESS supply deal will run from 2026 to 2029. The batteries will be supplied in phases, supporting the rapid buildout of US battery energy storage systems as utilities, renewable developers, and infrastructure operators seek more flexible power capacity.

The agreement also strengthens Samsung SDI’s US manufacturing strategy. The batteries will be produced at StarPlus Energy’s plant in Indiana, a joint venture between Samsung SDI and Stellantis.

Indiana Production Links Battery Storage to Domestic Manufacturing

The StarPlus Energy facility gives Samsung SDI a local production base for the US energy storage market. This matters because US customers increasingly value domestic or regionally anchored battery supply chains, especially for energy infrastructure projects.

Initial deliveries will use nickel-cobalt-aluminum batteries. This chemistry gives Samsung SDI a route to serve early BESS demand while preparing for broader chemistry diversification.

Later expansion will include lithium iron phosphate batteries. LFP batteries are becoming more important in stationary storage because cost, safety, cycle life, and scale matter more than maximum energy density in many grid applications.

LFP Expansion Signals a Wider Shift in US BESS Demand

The Samsung SDI BESS supply deal follows another major LFP agreement signed last December with an unnamed US energy infrastructure company. That earlier contract was valued at two trillion won, or about $1.33 billion.

Together, the deals show that Samsung SDI is moving more aggressively into the US battery energy storage systems market. The company is no longer positioned only around electric vehicle batteries, but also around grid storage and power infrastructure.

This shift has important materials implications. BESS growth will increase demand for lithium, iron phosphate materials, nickel, cobalt, aluminum, copper, graphite, separators, electrolytes, and power electronics. It will also intensify competition among Korean, Chinese, Japanese, and US-linked battery supply chains.

The Metalnomist Commentary

Samsung SDI’s latest contract confirms that US battery demand is shifting from EV-only growth toward a broader energy infrastructure cycle. For battery makers, chemistry flexibility and local production are becoming as important as scale itself.

Ford Energy BESS Deal With EDF Signals Automaker Push Into Grid Storage

No comments
Ford Energy BESS Deal With EDF Signals Automaker Push Into Grid Storage
Ford Energy

Ford Energy BESS deal with EDF Power Solutions North America marks a major step in Ford’s move from vehicle batteries into grid-scale energy storage. Ford Energy will supply EDF with 20GWh of battery energy storage systems over five years starting in 2028.

Ford Energy BESS deal gives EDF access to up to 4GWh/yr of DC block systems for utility-scale storage projects across the US. The agreement positions Ford Energy as a key domestic supplier for large energy storage developers.

Ford Energy BESS deal also shows how automakers are repurposing battery manufacturing assets for stationary storage. Ford is investing $2bn to convert its Glendale, Kentucky, battery facility for the BESS market.

The transaction connects three fast-growing demand drivers: grid storage, data centers and US-made battery systems. It also reinforces the strategic role of lithium iron phosphate batteries in stationary applications.

LFP Storage Supports Utilities, Data Centers and Industrial Customers

Ford Energy’s DC Block is a standardized 20ft containerized battery energy storage system. Each unit has 5.45MWh of capacity and uses lithium iron phosphate prismatic cells.

The system is available in two-hour and four-hour discharge configurations. That flexibility allows EDF to deploy storage across different grid services, renewable integration and peak-shifting applications.

LFP batteries are well suited to stationary storage because they offer cost advantages, safety benefits and long cycle life. They also reduce exposure to nickel and cobalt compared with higher-nickel lithium-ion chemistries.

Ford Energy plans to assemble BESS in the US for utilities, data centers, large industrial customers and commercial users. That customer mix reflects how electricity demand is changing.

Data centers are becoming a major new source of power demand. Battery storage can help manage grid congestion, renewable intermittency and backup power requirements.

EDF already has a large platform for deployment. The company has developed 26GW of projects and holds 17GW under service contracts, giving Ford Energy a major channel into the US storage market.

Repurposed Battery Capacity Strengthens US Storage Supply Chain

Ford Energy plans to deploy at least 20GWh/yr of BESS capacity, with first customer deliveries scheduled for late 2027. The EDF agreement will absorb a meaningful share of early output from 2028.

The Glendale investment is strategically important. It shows how battery manufacturing capacity originally linked to vehicle electrification can be redirected toward stationary storage.

This matters because EV demand growth has become less linear, while grid storage demand continues to rise. Automakers with battery manufacturing assets may find BESS a valuable second market.

The deal also strengthens the US energy storage supply chain. Domestic assembly can reduce logistics risk, support local content requirements and improve delivery certainty for infrastructure customers.

For battery materials, the agreement supports demand for lithium, phosphate, graphite, copper, aluminium and battery-grade chemicals tied to LFP cells and storage systems.

The wider implication is clear. Battery demand is no longer only an EV story. Utilities, data centers and industrial customers are becoming major buyers of battery systems as power reliability becomes a strategic constraint.

The Metalnomist Commentary

Ford’s EDF agreement shows that stationary storage is becoming a major outlet for battery manufacturing capacity. The strategic winners will be companies that can combine US assembly, LFP chemistry and long-term supply agreements with grid and data-center customers.

UCB Power BESS Production Gains Tax Support in Brazil

No comments
UCB Power BESS Production Gains Tax Support in Brazil
UCB Power

UCB Power BESS production will receive tax support as Brazil seeks to expand domestic manufacturing of battery energy storage systems. The Brazilian battery producer will benefit from reduced import tariffs on foreign components used in production.

UCB Power BESS production adds another industrial layer to Brazil’s growing energy storage market. The incentives will be administered through the Manaus Free Trade Zone framework, although specific tariff reductions have not been disclosed.

UCB Power BESS production also has implications for critical mineral demand. Lithium-ion storage systems require materials including lithium, nickel, cobalt, manganese, graphite, copper and aluminium across cells, electrical systems and enclosures.

The policy therefore supports more than battery assembly. It could help Brazil gradually build a domestic energy storage ecosystem around renewable power, grids and industrial electricity management.

Tax Incentives Strengthen Domestic Battery Manufacturing

Brazil’s Manaus Free Trade Zone provides tax incentives intended to encourage industrial production in the country’s northern region.

UCB Power will gain lower import costs for foreign components required in BESS manufacturing. This can improve the competitiveness of domestic production while Brazil develops more local supply capability.

The incentives remain subject to standard requirements within the Manaus framework, including environmental and research obligations.

Battery storage manufacturing remains dependent on imported cells, materials and electronic components in many emerging markets. Lower tariffs can therefore reduce the cost disadvantage faced by local manufacturers during the early stages of industry development.

UCB already operates battery factories in Manaus and Extrema, Minas Gerais. The company says its portfolio represents more than 7.8GWh of installed capacity.

That existing manufacturing base gives UCB a stronger position to expand into grid-scale and industrial energy storage as Brazilian electricity demand evolves.

BESS Growth Could Create New Critical Mineral Demand

Battery energy storage is becoming increasingly important as power systems integrate more intermittent renewable generation.

BESS installations can store electricity when supply is abundant and discharge it when demand rises, improving grid flexibility and helping industrial users manage electricity costs.

Lithium-ion technology currently dominates the market, creating demand across a broad range of battery materials.

For Brazil, this creates an opportunity to connect domestic battery manufacturing with its substantial mineral resource base. The country has resources across lithium, nickel, manganese and other materials relevant to energy storage.

However, mineral availability alone will not create an integrated battery industry. Brazil will need refining, active materials production, cell manufacturing and recycling capacity if it wants to capture more of the value chain.

Supporting BESS assembly is therefore an early step toward a broader industrial ecosystem rather than the endpoint.

The Metalnomist Commentary

Brazil has the mineral resources and renewable power base to build a larger battery industry, but the missing link remains downstream processing and cell production. UCB’s expansion can help create domestic demand that makes those investments more commercially attractive.

Michigan BESS Projects Approved to Support Grid Reliability and Data Center Growth

No comments
Michigan BESS Projects Approved to Support Grid Reliability and Data Center Growth
Michigan BESS Projects

Michigan BESS projects received regulatory approval on 27 March, adding 1,332MW of battery energy storage capacity to support grid reliability, renewable power integration and large-load electricity demand. The Michigan Public Service Commission approved six battery energy storage system projects across two major demand areas.

Three of the Michigan BESS projects will provide a combined 1,000MW to support DTE Electric’s integrated resource plan. That plan calls for adding 15,000MW of solar and wind generation in Michigan, making storage capacity essential for balancing intermittent renewable output.

The remaining three projects, totalling 332MW, will support a 1,383MW data center being developed by Green Chile Ventures, an Oracle subsidiary. The storage assets are intended to improve reliability and reduce costs for customers as data center electricity demand rises.

Battery Storage Becomes Critical for Renewable Grid Planning

Battery energy storage systems are becoming a core part of Michigan’s clean power buildout. DTE Electric’s 1,000MW of approved storage will be tied to 20-year tolling agreements, giving the utility more flexibility as solar and wind capacity expands.

This matters because renewable power growth requires fast-response assets that can shift electricity from periods of high generation to periods of high demand. BESS projects can also reduce strain on the grid during peak periods and support more reliable power delivery.

Michigan BESS projects therefore represent more than a backup power investment. They are part of the infrastructure needed to make renewable generation useful at scale and to protect grid stability as electricity demand grows.

Data Center Demand Adds a New Storage Growth Channel

The data center-linked BESS projects show how artificial intelligence and cloud infrastructure are reshaping power markets. Green Chile Ventures must develop 1,383MW of energy storage to match the contracted demand of its data center project.

The approved 332MW is only the first phase of that requirement. Green Chile Ventures will bear the costs over 15 years, while DTE Electric will develop, own and operate the facilities.

This structure highlights a wider market trend. Data centers need faster power access, and battery storage can help bridge the gap between project timelines, grid constraints and customer affordability concerns. Michigan already hosts 74 data centers, with Detroit accounting for 32, making power infrastructure an increasingly important competitiveness factor.

The Metalnomist Commentary

Michigan BESS projects show that battery storage is becoming essential infrastructure for both renewable energy and AI-driven data center growth. The next bottleneck will not only be battery supply, but also transformers, grid equipment, copper, aluminium and permitting capacity.

Chile Lithium BESS Project Launches in Atacama Desert

No comments
Chile Lithium BESS Project Launches in Atacama Desert
Atlas Renewable Energy

Atlas Renewable Energy has officially launched the largest Chile lithium BESS project in Latin America. The new Desert BESS facility, located in Chile's Atacama Desert, stores up to 800 MWh of solar energy using 320 lithium-based battery units. It can deliver 200 MW of power, enough to serve 122,000 households year-round.

Powering Buses and Cutting Nighttime Energy Costs

The BESS will operate under a 15-year power deal with Chilean firm Copec Emoac. Copec plans to use the system to power 2,500 electric buses across three states. As a result, each bus can travel up to 69,000 kilometers per year, significantly reducing transportation emissions and energy costs during peak nighttime hours.

Accelerating Chile’s 2030 Energy Storage Goals

The Desert BESS adds over 200 MW to Chile’s grid, pushing national energy storage above 1 GW. Therefore, the country is now on track to exceed its 2030 target of 2 GW of storage capacity by 2026 — four years ahead of schedule. The Chile lithium BESS project showcases how private-sector partnerships can accelerate public energy goals.

The Metalnomist Commentary

The Chile lithium BESS project is a milestone in Latin America's clean energy transition. Its scale, speed, and smart integration with electric mobility offer a roadmap for emerging markets aiming to lead in grid modernization.

Adani Green BESS Expansion Makes Khavda a Major Grid Storage Platform

No comments
Adani Green BESS Expansion Makes Khavda a Major Grid Storage Platform
Adani Green Energy

Adani Green BESS capacity has reached 3.37GWh at the Khavda renewable energy park in Gujarat, marking a major step in India’s effort to make large-scale renewable power more reliable and dispatchable. Adani Green Energy added 2GWh to the 1.37GWh installed in March.

Adani Green BESS development at Khavda is significant because the project is now the largest single-location battery storage installation outside China, according to the company. The system is co-located with AGEL’s 30GW renewable energy project, of which 9.9GW is already operational.

Adani Green BESS expansion also signals how India’s clean energy transition is moving beyond generation capacity alone. Solar and wind projects need storage to manage intermittency, stabilise grids and supply power during peak demand periods.

The company plans to scale its storage footprint quickly. It is targeting more than 10GWh of new capacity by March 2027 and aims to reach 50GWh over the next five years.

Khavda Storage Strengthens Renewable Power Dispatchability

The Khavda BESS uses lithium-ion battery technology integrated with advanced energy management systems. This allows faster grid response, better stability and more reliable renewable power delivery.

This matters because India is adding renewable power at scale, but grid flexibility remains a major constraint. Battery storage helps convert variable solar and wind generation into usable power during high-demand periods.

AGEL said the 3.37GWh system can power about 1mn homes for a full day. It can also meet peak electricity demand in cities such as Indore or Chandigarh, or supply the entire state of Goa.

The Khavda project therefore shows how battery storage is becoming core electricity infrastructure. It is no longer only a backup tool or pilot technology.

For India, this type of storage capacity supports energy security, renewable integration and reduced dependence on fossil fuel peaking power. It also strengthens the case for more domestic battery materials, cell manufacturing and power electronics capacity.

Battery Storage Growth Lifts Materials and Supply-Chain Demand

Large BESS projects create demand across several material chains. Lithium-ion batteries require lithium, graphite, copper, aluminium, separators, electrolytes, battery management systems and thermal control technologies.

Copper demand is also supported by cabling, grid connections, transformers and power conversion systems. Aluminium can benefit through enclosures, busbars, structural systems and cooling components.

India’s rapid storage targets could therefore deepen demand for battery raw materials and downstream manufacturing. The country will need reliable supply chains for cells, modules, inverters and grid equipment if it wants to scale from gigawatt-hours to tens of gigawatt-hours.

The Khavda system also highlights the strategic link between renewable energy and industrial policy. Battery storage deployment can create demand signals for local manufacturing, recycling and critical minerals processing.

However, scaling to 50GWh will require capital, land, grid integration, battery procurement and long-term project economics. Storage must become not only technically viable, but also financially repeatable.

Adani Green’s commissioning shows that India is moving quickly. The next challenge is building a domestic ecosystem that can support storage deployment without relying too heavily on imported battery materials and equipment.

The Metalnomist Commentary

Khavda shows that the renewable energy race is becoming a storage race. India’s next clean-energy bottleneck will not be only solar or wind capacity, but the battery materials, grid equipment and financing needed to make renewable power dispatchable.

Ford BESS market entry accelerates after $19.5bn Ford EV write-down

No comments
Ford BESS market entry accelerates after $19.5bn Ford EV write-down
Ford BESS

Ford BESS market entry is now central to Ford Motor’s updated electrification strategy. The automaker launched a battery energy storage systems unit as it prepares a Ford EV write-down totaling $19.5bn. As a result, Ford is repositioning capital toward grid infrastructure and data center demand.

Ford said weak demand and high costs pushed it to shelve plans for large EVs. However, the company still targets a more electrified fleet mix by 2030. Therefore, Ford BESS market entry signals a pivot toward returns that look steadier than passenger EV margins.

Ford battery energy storage systems business targets data centers and grids

Ford battery energy storage systems business will lean on lithium-iron-phosphate technology. Ford will also use its wholly owned plants in Kentucky and Michigan. Meanwhile, the company aims to serve energy infrastructure upgrades and expanding data center loads.

Ford plans to begin shipping BESS products in 2027. The company expects annual capacity to reach 20GWh. As a result, Ford battery energy storage systems business could become a meaningful industrial demand driver for LFP inputs and power electronics.

EV strategy resets around hybrids and EREVs

Ford widened its EV definition to include hybrids, EREVs, and BEVs. An EREV uses a gasoline engine to recharge the battery, not drive the wheels. Therefore, EREVs can extend range without frequent plug-in charging.

Ford expects electrified vehicles to represent about 50% of global production by 2030. That compares with roughly 17% today. Meanwhile, Ford EV write-down reflects how quickly automakers must reassess platform bets when demand softens.

Ford also ended production of the current-generation F-150 Lightning. The company now plans to adopt EREV architecture for the next generation. As a result, Ford aligns product planning with consumer range expectations and cost discipline.

The Metalnomist Commentary

This shift ties automotive manufacturing closer to stationary power markets. However, BESS success will depend on execution, sourcing, and project-cycle discipline. Therefore, Ford’s move could reshape LFP supply competition with established storage players.

TotalEnergies to Supply 1GWh of BESS to Japan

No comments
TotalEnergies to Supply 1GWh of BESS to Japan
Gurin Energy

Saft to Power Fukushima’s Energy Transition

TotalEnergies subsidiary Saft will supply over 1GWh of battery energy storage systems (BESS) for Gurin Energy’s renewable project in Japan. The system will include integrated lithium-ion batteries, power conversion units, and energy management platforms. Saft will also oversee installation, commissioning, and servicing, ensuring long-term operational reliability.

The BESS will be deployed in Fukushima Prefecture, delivering 240MW of power in four-hour cycles. Construction is expected to begin in 2026, marking one of Japan’s largest single-site BESS installations. This development highlights Japan’s efforts to stabilize its renewable power grid and enhance supply reliability.

Supporting Japan’s Renewable and Carbon Goals

Japan is targeting 40–50pc renewables in its power generation mix by 2040, up from 27pc today. The country also aims to achieve full carbon neutrality by 2050. Advanced storage solutions like Saft’s BESS are critical to balancing intermittent wind and solar generation.

Meanwhile, large-scale deployments like this project show how international partnerships can accelerate Japan’s clean energy transition. By supporting flexible storage capacity, TotalEnergies and Gurin Energy contribute to reducing reliance on fossil fuels while strengthening grid resilience.

The Metalnomist Commentary

TotalEnergies’ 1GWh BESS project in Fukushima illustrates the growing convergence of global energy players and local renewable developers. Japan’s aggressive carbon neutrality roadmap depends on scalable storage solutions, and this deal positions Saft as a key technology supplier. Investors should watch for how such projects influence Asia’s broader grid modernization strategies.

Samsung SDI US BESS supply deal signals a new supply phase for grid storage

No comments
Samsung SDI US BESS supply deal signals a new supply phase for grid storage
Samsung SDI, BESS

Samsung SDI US BESS supply deal locks in a large, multi-year grid storage order. The contract totals 1.5 trillion won, about $1bn. It runs in phases from 2026 to 2029.

The Samsung SDI US BESS supply deal will serve an unnamed US energy company. The batteries will come from StarPlus Energy in Indiana. StarPlus Energy is Samsung SDI’s joint venture with Stellantis.

What the Samsung SDI US BESS supply deal covers

The initial shipments will use nickel-cobalt-aluminum battery chemistry. This chemistry targets high power and strong cycling performance. Therefore, it fits early ramp needs for utility-scale storage.

Later phases will expand into lithium iron phosphate batteries. LFP improves cost stability and supply resilience. As a result, Samsung SDI can address broader project economics.

Why Indiana production and LFP expansion matter

Indiana-based production reduces logistics risk and delivery lead times. It also helps buyers align with domestic sourcing preferences. Meanwhile, it supports predictable capacity planning for multi-year deployments.

Samsung SDI’s recent US activity reinforces this direction. The company signed a separate two-trillion-won LFP supply agreement last December. Therefore, Samsung SDI positions LFP as a core growth lever in US storage.

The Metalnomist Commentary

This shift signals a maturing BESS market that values bankable delivery over headline capacity. However, margins will depend on raw material spreads and contract pricing formulas. The winners will scale localized supply without losing cost discipline.

Texas BESS Project Unites OCI, CPS Energy, and LG Energy Solution

No comments
Texas BESS Project Unites OCI, CPS Energy, and LG Energy Solution
CPS Energy

OCI Energy, CPS Energy, and LG Energy Solution launched a major Texas BESS project collaboration. The 120MW/480MWh Alamo City battery storage system will stabilize Bexar County's power grid. This strategic Texas BESS project partnership advances San Antonio's energy resilience goals significantly.

LGES Vertech Supplies Advanced Battery Technology

LG Energy Solution's US division Vertech will provide cutting-edge battery systems and management technology. OCI Energy develops the project while CPS Energy secures the storage capacity offtake agreement. Meanwhile, this partnership raises CPS's total contracted battery storage to 520MW. The facility targets operational status by late 2026.
The Texas BESS project supports grid stability during peak electricity demand periods. Furthermore, the 20-year agreement ensures long-term energy security for San Antonio residents. This development aligns with Texas's growing energy storage infrastructure requirements.

Strategic Impact on Texas Energy Transition

CPS Energy's Vision 2027 plan incorporates this battery storage system comprehensively. The initiative adds 1,710MW natural gas, 730MW solar, and 84MW wind capacity. Therefore, energy storage becomes crucial for renewable integration and grid balancing. The project demonstrates Texas's commitment to diversified energy solutions.

Battery energy storage systems transform Texas's electricity market dynamics fundamentally. Moreover, Korean battery technology strengthens US-South Korea clean energy partnerships. As a result, San Antonio gains enhanced grid resilience and sustainability capabilities. This Texas BESS project model could inspire similar developments statewide.

The Metalnomist Commentary

LG Energy Solution's participation highlights Korean battery manufacturers' aggressive US market expansion amid IRA incentives. The 480MWh capacity represents significant lithium-ion battery demand, potentially requiring 400-500 tonnes of lithium carbonate equivalent. This project exemplifies how energy storage drives critical mineral demand while enabling renewable energy integration at scale.

Falling Battery Costs Drive Longer Duration Energy Storage Expansion

No comments
CERAWeek

Shift to LFP chemistry and falling raw material prices boost two-hour-plus BESS projects, but SoC accuracy remains a hurdle.

Lower Battery Costs Accelerate BESS Deployment

Lower battery prices are transforming the energy storage market by enabling more battery energy storage systems (BESS) with longer durations, according to experts at the CERAWeek by S&P Global conference in Houston. Charlotte Johnson, general manager of InfraFlex (a Kraken unit), stated, "Lower prices have accelerated the deployment of BESS of two hours and more, rather than the one-hour systems."

Battery cells represent about 50% of total project costs, while the remainder goes to labor, operations, and maintenance. As battery cell costs fall, project developers are increasingly building longer-duration BESS to meet grid flexibility and renewable integration needs.

LFP Batteries Drive Cost Cuts but Add Challenges

The price drop stems largely from falling battery raw material costs and a rapid shift to lithium iron phosphate (LFP) battery chemistry. LFP cells are cheaper and more stable than nickel-based alternatives, making them ideal for utility-scale BESS projects.

However, panelists warned of a drawback: LFP systems have less predictable state of charge (SoC) behavior. Inaccurate SoC readings complicate real-time optimization and revenue maximization for grid operators and energy traders.

Outlook: Market Growth Continues Amid Technical Hurdles

While SoC monitoring remains a challenge, the economic advantages of LFP and longer-duration storage outweigh the downsides for now. Developers and technology providers are focusing on improving SoC management tools and software to unlock greater value from low-cost, longer-duration systems.

Lyten acquires Northvolt BESS assets to expand European capacity

No comments
Lyten acquires Northvolt BESS assets to expand European capacity
Lyten

Lyten acquires Northvolt BESS assets to control Europe’s largest BESS manufacturing hub. The 25,000m² Gdansk site includes R&D and modern assembly lines. Installed equipment supports 6GWh annually, with expansion potential above 10GWh.

The deal is expected to close in the third quarter. Financial terms were not disclosed by the parties. Lyten plans to restart production immediately and resume commercial sales.

Immediate restart and lithium-sulfur expansion

Lyten will broaden the product line to include lithium-sulfur batteries. These lithium-sulfur batteries now ship for drones and space missions. They are launching to the International Space Station under commercial programs. Chrysler selected the chemistry for its Halcyon Concept electric vehicle. Therefore, Lyten acquires Northvolt BESS assets to accelerate commercialization.

Financing, footprint, and Northvolt’s portfolio reshaping

In December 2025, Lyten received up to $650 million from the Export-Import Bank. The company also acquired Northvolt’s San Leandro battery plant to scale US output. Meanwhile, Northvolt sold business segments during its restructuring process. Scania acquired the Industrial segment in April 2025.

As a result, this acquisition gives Lyten a transatlantic manufacturing footprint. The Gdansk plant offers scale for utility storage and grid services. Therefore, European customers gain a new BESS source outside China.

The Metalnomist Commentary

This move rapidly converts idle capacity into strategic supply for Europe’s grid storage build-out. Execution on lithium-sulfur at scale remains the key technical and commercial swing factor.

Canadian Solar Battery Storage Guidance Jumps 21% on Data Center Demand

No comments
Canadian Solar Battery Storage Guidance Jumps 21% on Data Center Demand
Canadian Solar

Canadian Solar battery storage shipments guidance for 2025 surged 21% as the renewable energy company capitalizes on growing demand from data centers and cryptocurrency mining operations. The company now expects utility-scale battery energy storage system (BESS) deliveries to reach 7-9 GWh in 2025, reflecting strong market fundamentals despite challenging industry conditions.

Data Centers Drive Battery Storage Market Growth

Canadian Solar battery storage business benefits from accelerating digitalization trends requiring reliable backup power solutions. Data centers and cryptocurrency mining facilities increasingly demand large-scale energy storage to ensure operational continuity and manage power costs. The company's revised guidance includes approximately 1 GWh designated for its own renewable energy projects.

Meanwhile, Canadian Solar secured a significant contract with Chilean utility Colbún in April. The deal involves supplying a 228MW/912MWh lithium iron phosphate BESS in Chile's Atacama Region. This project demonstrates the company's ability to compete for major utility-scale installations in key Latin American markets.

Industry Headwinds Impact Financial Performance

However, Canadian Solar faces mounting challenges affecting profitability across its operations. Geopolitical uncertainty reduces business visibility while oversupply and fierce competition pressure margins throughout the renewable energy sector. These factors contributed to deteriorating financial results in the first quarter.

Therefore, the company reported a $76.6 million net loss in Q1 2025, contrasting sharply with $36.2 million net income in the prior year period. Seasonally lower BESS sales and trade-related duties further compressed margins during the quarter.

Q2 Recovery Expected Despite Market Pressures

Canadian Solar battery storage shipments totaled 0.8 GWh in Q1 but management expects significant improvement ahead. The company projects 2.4-2.6 GWh in BESS deliveries during the second quarter, indicating strong sequential growth momentum.
As a result, Canadian Solar positions itself to benefit from structural demand growth in energy storage markets. The company's focus on utility-scale projects and strategic partnerships with major utilities supports its optimistic 2025 outlook despite near-term profitability challenges.

The Metalnomist Commentary

Canadian Solar's upgraded BESS guidance reflects the energy storage sector's rapid evolution driven by digital infrastructure expansion and grid modernization needs. While the company navigates challenging market conditions including oversupply and trade tensions, its strategic positioning in high-growth segments like data center storage creates compelling long-term value propositions for investors and industry stakeholders.

Cordelio Power Acquires 1GWh of Battery Energy Storage Systems from Fluence Energy

No comments
Battery Energy Storage Systems (BESS)

Canadian independent power producer Cordelio Power has secured over 1GWh of battery energy storage systems (BESS) from Fluence Energy, marking a significant move in its energy storage portfolio. This purchase is aimed at supporting several BESS projects in Cordelio's 2026-2027 pipeline, which are expected to contribute to North America's green energy transition.

Strategic Expansion in Battery Energy Storage

Fluence Energy, a prominent US energy storage provider, was chosen by Cordelio Power for its cutting-edge storage technology. Fluence boasts a US-based supply chain, ensuring that no Chinese products are involved, which aligns with Cordelio's commitment to secure and sustainable energy solutions. However, the financial details of this acquisition and the specifics of the upcoming projects remain undisclosed.

Cordelio Power is actively expanding its presence in the energy storage market, focusing on large-scale projects designed to enhance grid stability and support renewable energy sources. The 1GWh purchase will be integral to the successful commissioning of multiple BESS projects scheduled for 2026-2027.

Key Projects in the US Pipeline

In addition to the acquisition of storage systems, Cordelio has secured offtake agreements for two major BESS facilities in the western US. The first is the Greenwater project, a 200MW, 800MWh facility located in Pierce County, Washington. This project will be developed in partnership with Puget Sound Energy. The second is the Pioneer project in Yuma County, Arizona, a larger 300MW, 1,200MWh project, set to be developed in collaboration with Arizona Public Service.

These projects highlight Cordelio's growing role in providing reliable energy storage solutions that complement renewable energy generation, paving the way for a cleaner and more resilient energy grid.

China’s Lithium-Ion Battery Output Jumps 24% in 2024 on EV and Storage Demand

No comments
China’s Lithium-Ion Battery

Lithium Carbonate Leads Growth Amid LFP Battery Expansion

China's lithium-ion battery production surged by 24% in 2024, driven by rising demand from electric vehicles (EVs) and battery energy storage systems (BESS). Output reached 1,170 GWh, up from 943 GWh in 2023, according to the Ministry of Industry and Information Technology (MIIT).

Segment-wise, EV battery production hit 826 GWh, while BESS batteries totaled 260 GWh, and consumer electronics added 84 GWh. The combined installed capacity for EVs and BESS rose to 645 GWh, marking a 48% year-on-year increase.

This significant expansion highlights China's continuing dominance in battery manufacturing and its strategic push into renewable energy infrastructure.

Lithium Carbonate Sees Strongest Production Growth

Battery-grade lithium carbonate production reached 670,000 metric tonnes in 2024, reflecting a 45% increase from 2023. Lithium hydroxide output grew to 360,000 tonnes, a 26% gain year-on-year, according to MIIT data.

Lithium carbonate’s growth outpaced lithium hydroxide due to increased adoption of Lithium Iron Phosphate (LFP) batteries. LFP technology, now widely used in EVs and BESS, primarily relies on lithium carbonate, rather than lithium hydroxide.

This shift reflects changing chemistry preferences among automakers and grid-scale storage developers, prioritizing cost, safety, and cycle life. As battery technologies evolve, the metals supply chain must adapt to meet diversified material demands.

For more updates on battery metals, energy storage trends, and lithium market forecasts, follow The Metalnomist.

Australia Invests $63 Million in Neoen’s Renewable Energy Projects

No comments
Neoen

The Australian government has committed A$100 million ($63.2 million) in funding to French renewable energy producer, Neoen, to support the development of three large-scale renewable energy and battery storage projects in Australia. This investment reflects Australia's ongoing push to expand its renewable energy infrastructure and reduce reliance on fossil fuels.

Focus on Battery Storage and Solar Power

The three projects in question include:
  1. A 341MW Battery Energy Storage System (BESS) in Western Australia.
  2. A 270MW BESS in Queensland.
  3. A 440MW peak solar farm in New South Wales.
These projects, which are still under development, aim to enhance Australia's energy security by integrating large-scale storage solutions with renewable energy generation. The Western Australia BESS is particularly significant as it will be an extension of the already operational Collie Battery Energy Storage System, which stores and discharges 219MW of power. Once both parts of the Collie system are fully operational, they will support up to 20% of the state's average energy needs.

Neoen’s New South Wales solar farm, known as the Culcairn Solar Farm, is scheduled to begin generating 800 GWh/year by 2026, covering an area of 1,000 hectares. While a BESS at the site is a possibility, Neoen has yet to make any official announcements regarding that development.

Role of the Clean Energy Finance Corporation (CEFC)

The Clean Energy Finance Corporation (CEFC), a state-owned green investment fund, is providing the funding to Neoen. The CEFC has already been involved in funding a total of 2.3GW worth of battery storage projects across Australia, playing a crucial role in the country's transition to a cleaner, more sustainable energy grid.

Australia’s Renewable Energy Growth

Renewable energy generation has surged across Australia, now accounting for 25% of the country’s total power generation in 2023, up from 17% in 2017. During the same period, the combined share of gas and coal in power generation fell from 81% to 63%. This shift aligns with the government’s broader climate goals, including decarbonizing the energy sector and ensuring energy resilience.

The funding commitment to Neoen comes just a day after the Australian government allocated A$14.1 million to GrainCorp and Ampol to promote the development of sustainable aviation fuels and renewable diesel.

Energy Vault and Jupiter Boost Texas Battery Storage Capacity

No comments
Energy Vault and Jupiter Boost Texas Battery Storage Capacity
Energy Vault

Expanding Utility-Scale Battery Energy Storage in Texas

Energy Vault and Jupiter Power will add 100MW/200MWh of utility-scale battery energy storage systems (BESS) to the Texas grid. The expansion builds on an existing 100MW/200MWh facility at a Jupiter site in the Electric Reliability Council of Texas (ERCOT) region, which is expected to begin commercial operations by late summer 2025.

The two companies have collaborated since signing a September 2022 deal to fast-track 2.4GWh of domestically qualified BESS. By increasing battery capacity, they aim to strengthen grid resilience, particularly in response to extreme weather events that have tested ERCOT’s stability in recent years.

Scaling Production and Supply Chain Integration

Austin-based Jupiter Power is developing 12GW of utility-scale energy storage projects across the United States, from California to Maine. In June 2024, Jupiter secured a 3GWh battery supply deal with China’s HiTHIUM, scheduled for delivery by the end of 2025. HiTHIUM is also establishing a 10GWh-per-year battery modules and systems plant in Mesquite, Texas, reinforcing domestic manufacturing capacity for large-scale storage projects.

The BESS expansion reflects growing demand for reliable renewable integration, enabling the grid to balance supply and demand more efficiently. By partnering with manufacturers and scaling local production, Energy Vault and Jupiter are positioning themselves as key players in the transition to a cleaner, more resilient US power grid.

The Metalnomist Commentary

The Energy Vault–Jupiter expansion underscores the accelerating deployment of large-scale storage to meet renewable integration challenges. The addition of domestic battery production in Texas could reduce supply chain risks and ensure faster deployment timelines. Success will depend on how efficiently these assets can be integrated into ERCOT’s operational framework.

Hithium and Samsung C&T Join Forces for 10GWh BESS Projects

No comments
Hithium

Hithium, a manufacturer of battery energy storage systems (BESS), has announced a partnership with Samsung C&T, a South Korean engineering and construction firm. The collaboration aims to pursue multiple global energy storage projects with a combined capacity of up to 10GWh.

Hithium's Expanding Global Presence

Hithium has a strong track record, having delivered over 50GWh of BESS products in China and Eastern Europe.  The company recently entered the Australian market with a 640MWh project in partnership with utility-scale renewable energy developer Lightsource BP. 

While the specific timeline for the newly announced projects with Samsung C&T was not disclosed, this partnership signifies a major expansion of Hithium's global footprint.  Hithium Tech USA, a subsidiary of Hithium, is also investing $100 million in a new battery module and energy storage assembly plant in Mesquite, Texas. This facility will have a production capacity of 10GWh per year.

India Renewable Curtailment Exposes Grid Bottleneck Behind Clean Power Growth

No comments
India Renewable Curtailment Exposes Grid Bottleneck Behind Clean Power Growth
Ember

India renewable curtailment reached around 300GWh in January-March because of transmission constraints, showing that the country’s clean power buildout is now running ahead of grid readiness. The lost generation accounted for nearly two-thirds of India’s total renewable curtailment in the first quarter.

India renewable curtailment was concentrated in renewable-heavy northern and western grid pooling stations, especially Rajasthan and Gujarat. These regions have added large solar and wind capacity, but transmission expansion has not kept pace.

India renewable curtailment is strategically important because wasted clean power weakens project economics, increases peak power costs and delays the energy transition. It also highlights rising demand for grid materials, including copper, aluminium conductors, transformers, electrical steel and battery storage systems.

The curtailed volume represented around 1.5-2% of total renewable generation from interstate transmission system-connected plants in northern and western India. On 30 March alone, India lost 34GWh of renewable output because of insufficient transmission margins.

Transmission Delays Threaten Renewable Project Economics

India has achieved only around 80% of its annual transmission buildout targets over the past five years. That gap is now becoming visible in curtailment, grid connection delays and weaker returns for renewable developers.

One in four interstate transmission schemes scheduled for the 2026-27 fiscal year faces delays of at least one year. Around 20GW of renewable capacity is expected to face grid connectivity delays exceeding four months.

These delays carry direct financial consequences. A six to twelve-month delay in solar projects can reduce internal rates of return by 100-200 basis points because of lost early cash flows and higher financing costs.

The problem also affects India’s fuel import exposure. Curtailed renewable generation could have displaced costly gas-fired power during peak demand periods, reducing reliance on expensive LNG at a time when spot gas prices were elevated by the US-Iran war.

For metals markets, the message is clear. India’s renewable buildout now needs faster transmission investment, which means more demand for aluminium conductor, copper cable, transformers, substations, steel structures and grid equipment.

BESS Deployment Offers Near-Term Relief

Battery energy storage systems could provide a near-term solution at renewable pooling stations. Ember estimates that around 3-4GW of two-hour storage could absorb most curtailed renewable generation.

The economics are becoming more attractive. Stored solar power delivered at 7-8 rupees/kWh would remain below the Rs9-10/kWh many Indian states pay for peak-demand electricity.

This makes BESS deployment more than a technical fix. It is a cost-control tool, a grid-stability tool and a way to protect renewable project returns.

Battery storage demand also has materials implications. BESS deployment supports demand for lithium, phosphate, graphite, copper, aluminium, power electronics and thermal management systems, with lithium iron phosphate likely to remain important for stationary storage.

India’s southern region recorded no transmission-related renewable losses because renewable additions and transmission readiness were better aligned. That contrast shows that curtailment is not inevitable; it is a planning and execution problem.

India’s clean power transition will therefore depend on synchronising generation, transmission and storage investment. Solar and wind additions alone will not deliver energy security if power cannot move from renewable zones to demand centres.

The Metalnomist Commentary

India’s renewable curtailment shows that the energy transition is becoming a grid materials story. The next bottleneck is not only solar panels or wind turbines, but transmission capacity, storage deployment and the metals needed to move clean electricity.