Showing posts sorted by relevance for query Mamicuo lithium. Sort by date Show all posts
Showing posts sorted by relevance for query Mamicuo lithium. Sort by date Show all posts

Zangge Mamicuo lithium project secures mining licence in Tibet

No comments
Zangge Mamicuo lithium project secures mining licence in Tibet
Mamicuo Li

Zangge Mamicuo lithium project secured a mining licence in Tibet. The approval clears a path to salt-lake production. Zangge Mamicuo lithium project now targets a 50,000 t/yr first phase. Therefore, Zangge Mamicuo lithium project advances toward near-term construction.

Licence scope and resources

The licence covers 115.36km² and includes lithium, boron, and potassium. Proven resources total 2.1774mn t LCE. Zangge holds a 26.95% stake in the asset. The permit was issued on 15 July and runs to 30 April 2030.

Build plan, power needs, and portfolio moves

Zangge will start constructing a 50,000 t/yr lithium carbonate plant in Q3. Construction should take nine to twelve months. Phase two adds 50,000–80,000 t/yr after full ramp. However, power reliability will determine second-phase timing. Meanwhile, Zangge produces lithium carbonate at Qarhan, with 2024 output of 11,566t. The company plans stakes in Jiezechaka and Longmucuo projects. It will acquire 39% of Tibet Guoneng Mining for 4.68bn yuan. As a result, integrated assets could strengthen China’s battery materials supply.

The Metalnomist Commentary

This licence elevates Tibet’s role in China’s brine-based lithium strategy. Execution now hinges on power stability and brine processing performance. Watch phase-two timing, capex discipline, and offtake alignment with cathode makers.