Showing posts sorted by relevance for query DED. Sort by date Show all posts
Showing posts sorted by relevance for query DED. Sort by date Show all posts

Norsk Titanium DED titanium parts face slower shift but capacity expands

No comments
Norsk Titanium DED titanium parts face slower shift but capacity expands
Norsk Titanium

Norsk Titanium DED titanium parts adoption is slower than expected across OEMs. The company pushed breakeven to early 2027. However, revenue rose 54% to $2mn in January–June. Norsk Titanium DED titanium parts still target aerospace, defense, and industrial growth. Therefore, management doubles down on serial readiness. Norsk Titanium DED titanium parts remain central to the firm’s strategy.

Transition dynamics and near-term commercial outlook

OEMs still prefer forgings for many qualified parts. As a result, transition timelines lengthen across programs. Operating expenses rose to $17.2mn from $13.4mn. The company now forecasts $70mn revenue in 2026. Mix splits roughly 50:50 between A&D and industrial. Contracts and mature discussions underpin the target. Execution depends on qualification pace and lot sizes.

Production readiness, RPD advantages, and scale plans

Norsk delivered contracted parts to Airbus this year. It qualified two additional machines and plans a third contract. Serial SKUs grew to 54 in the first half. Orders lifted the count to 56 with DOE parts. In-house machining and heat treatment reduce lead times. RPD melts titanium wire in argon to near-net shapes. Scrap falls below 10% versus conventional forging. Installed capacity stands at 700 t/yr.

The Metalnomist Commentary

RPD economics improve with higher buy-to-fly ratios and stable cadences. Watch OEM design-for-additive incentives and multi-year LTA scope. Qualification velocity will decide 2026–2027 cash inflection.

Norsk Titanium Airbus Partnership Advances Titanium Additive Manufacturing for Aerospace

No comments
Norsk Titanium Airbus Partnership Advances Titanium Additive Manufacturing for Aerospace
Norsk Titanium

Norsk Titanium Airbus partnership plans mark another step toward industrializing titanium additive manufacturing for aerospace production. Norwegian additive manufacturer Norsk Titanium has agreed to work with Airbus on directed energy deposition using Norsk’s rapid plasma deposition technology.

The agreement will place a Merke IV rapid plasma deposition machine at Airbus’ Varel production site in Germany. The companies will jointly evaluate manufacturing controls, validation data, and process documentation to support broader aerospace use.

Norsk Titanium Airbus partnership activity builds on an existing long-term master supply agreement. Under that arrangement, Norsk already supplies rapid plasma deposition titanium material for A350 production at Varel.

Rapid Plasma Deposition Targets Titanium Cost and Scrap Reduction

Rapid plasma deposition uses plasma arcs to melt titanium wire in an inert atmosphere and build near-net-shape preforms. This approach can reduce machining requirements and scrap compared with conventional forged titanium components.

This matters because aerospace titanium production is costly, material-intensive, and highly dependent on qualified processing routes. Conventional machining can remove large volumes of titanium from forged or rolled input stock, creating both cost and scrap management challenges.

Norsk’s process offers a different manufacturing route by building material closer to the final component geometry. If the process scales reliably, it could improve buy-to-fly ratios, reduce waste, and support more efficient titanium supply chains for aircraft structures.

Process-Based Qualification Could Reshape Aerospace Adoption

The collaboration aims to move beyond part-specific qualification toward broader process-based methodologies for selected titanium products. This is strategically important because aerospace adoption of additive manufacturing often slows when each component requires a separate qualification path.

A more standardized process-based approach could make titanium additive manufacturing easier to deploy across multiple parts. However, the technology remains at an early stage of industrialization, and aerospace customers will require strong evidence on repeatability, traceability, mechanical performance, and production control.

For Airbus, the Varel installation creates a closer link between additive process development and real aircraft production needs. For Norsk Titanium, the agreement strengthens its position as a supplier of industrial-scale titanium preforms for commercial aerospace programs.

The Metalnomist Commentary

The Norsk-Airbus agreement shows that aerospace additive manufacturing is shifting from demonstration toward controlled industrial qualification. The key breakthrough will come when titanium DED becomes a repeatable production process, not only a part-by-part engineering solution.