ABTC Lithium Refinery Grant Reinstated for Nevada Project

ABTC regains a $115mn DOE grant for its Nevada lithium hydroxide refinery project.
0
ABTC Lithium Refinery Grant Reinstated for Nevada Project
American Battery Technology Company

ABTC lithium refinery development has regained federal backing after the US Department of Energy reinstated a $115mn grant for the Tonopah Flat Lithium Project in Nevada. The decision restores the full funding package without changes to milestones, technical requirements or grant value.

ABTC lithium refinery plans target 30,000 t/yr of battery-grade lithium hydroxide production from locally mined claystone. The project would process around 11.9mn t/yr of ore at full scale, creating a domestic source of refined lithium for battery manufacturing.

ABTC lithium refinery funding had been terminated in October 2025 after the company completed the first two years of its five-year DOE agreement. The company appealed the decision, leading the department to reverse the termination and allow the project to continue.

The reinstatement strengthens the project's financing position and supports wider US efforts to build domestic lithium mining and refining capacity.

Tonopah Flat Targets 30,000 t/yr of Lithium Hydroxide

The Tonopah Flat Lithium Project is located northwest of Tonopah, Nevada, and is based on a large lithium claystone resource.

ABTC plans to develop the refinery in three stages. The first phase will produce 5,000 t/yr of lithium hydroxide, followed by two additional phases that will each add 12,500 t/yr.

This phased approach reduces the initial capital and execution burden compared with building the full 30,000 t/yr facility immediately. It also gives ABTC time to validate processing performance before expanding capacity.

The DOE originally selected the project for funding in October 2022 to support the first commercial-scale phase. Federal support is particularly important because lithium clay processing remains less established than conventional hard-rock or brine production routes.

If successful, Tonopah Flat could expand the range of economically viable lithium resources in the US and reduce reliance on imported refined battery materials.

Project Economics Depend on Scaling Claystone Processing

ABTC estimates operating costs at $6,994/t of lithium hydroxide, including both mining and refining expenses.

That compares with recent US delivered lithium hydroxide prices of around $19,000-21,000/t, suggesting potentially attractive margins if the company can achieve its projected cost structure and production rates.

However, commercial scale-up remains the key challenge. Claystone deposits can contain large lithium resources, but extraction and refining require technically complex processing and significant material handling.

Processing 11.9mn t/yr of claystone also creates substantial infrastructure requirements. Mining, crushing, leaching, purification and waste management systems must all operate reliably to support full-scale output.

The reinstated DOE grant reduces financing pressure for the first phase, but ABTC will still need to prove that its process can deliver consistent battery-grade lithium hydroxide at commercial scale.

For the US battery supply chain, the project is strategically important because domestic refining remains a major bottleneck. Producing lithium hydroxide inside Nevada would connect upstream resources more directly with North American cathode and battery manufacturing.

The Metalnomist Commentary

The grant reinstatement gives ABTC a second chance to prove lithium claystone at commercial scale. If Tonopah Flat reaches its cost and output targets, it could open a new domestic pathway for US lithium hydroxide supply.

No comments

Post a Comment